Archive for 07/20/2009

here are the pictures from this mornings pour. we poured the basement walls, next is the basement concrete floor and then the second “story” or above grade/main floor. it’s slowly starting to feel like a house!

Advertisements

these are some pictures from this past week. the pump truck is scheduled to arrive in ten min. (6:30am) and the concrete at 7am… more pictures to follow.